Nissan Terrano 2 with 1985 on 1999
1. The maintenance instruction and to maintenance service
2. Car maintenance service
3. Четырехцилиндровыв engines
4. Engines VS
5. All engines
6. Systems of cooling, heating, ventilation and air-conditioning
7. Fuel and exhaust systems
7.1. Fuel system - the general data
7.2. The fuel filter - replacement
7.3. Idling turns - check and adjustment
7.4. A fuel highway - repair
7.5. A cable of a drive throttle заслонки - removal and installation
7.6. A pedal - removal and installation
7.7. The fuel pump - check
7.8. The fuel pump - removal and installation
7.9. System of electronic injection of fuel - the general data
7.10. Units of control and measuring system with processor block ECCS - the general data
7.11. Декомпрессия fuel system
7.12. The case throttle заслонки (for systems with preliminary injection ТВI of systems) removal and installation
7.13. An atomizer replacement
7.14. System of injection of fuel – adjustments System of preliminary injection (TBI)
7.15. Fuel system clearing
7.16. A tank removal and installation
7.17. The gauge of level of fuel removal and installation
7.18. A tank washing
7.19. An exhaust system the general data
7.20. A forward exhaust pipe removal and installation
7.21. Katalitichesky нейтрализаторснятие and installation
7.22. The muffler removal and installation
7.23. An average pipe removal and installation
8. System of an electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. A mechanical transmission
11. Automatic transmissions
12. Coupling карданный a shaft and the back bridge
13. A running gear of cars with the wheel formula 4x4
14. Brake system
15. Suspension brackets and a steering
16. A body and furnish elements
17. Electric equipment system
 







7-13-forsunka-zamena.html

7.13. An atomizer replacement

System with preliminary injection
1. Execute декомпрессию and remove the case заслонки.
2. Remove from the case a lining and a sealant conductings (photo).
3. Uncover atomizers (photo)

13.3 Screws of a cover of an atomizer 1. A cover 2,3. Screws


13.46 Sizes оправки (out of brackets in mm) and the scheme of its arrangement at выбивании atomizers 1. Оправка 2. A plastic hammer 3. The sizes in mm


13.5 At removal of atomizers always change sealing rings 1. The big ring 2. A small ring 3. A rubber ring


13.6б take aside a uvula and push out a conclusion 1. A screw-driver 2. A uvula 3. A conclusion 4. To push out


4. Open заслонку and cautiously beat out an atomizer blows on оправке with internal diameter not less than 5,4 mm (photo). Do not damage an atomizer.
5. If sealing rings replace small and big rubber rings vary only, having greased with their silicone greasing. Establish an atomizer (photo).
6. If the faulty atomizer get from a socket a conclusion of a wire of a faulty atomizer for what do the following varies:
Get a clamp of a conclusion (photo),
A thin screw-driver take away a uvula and at once push out a conclusion, for a wire not to pull (photo),
Cut off a wire directly at plugs (photo), preliminary having defined the necessary wire under the scheme (photo).
7. Stretch a new wire through a sealant and a sleeve (a sealant replace).
8. Dress the plug, attach to a wire a conclusion and press out. Insert a conclusion into a socket being guided by the scheme distributings (photo).
9. Insert a conclusion into a socket.

13.6а For a detachment of a conclusion from a socket remove the holder 1. To push out


13.6в Cut off a wire at the plug and extend from a sleeve


13.8а Joining of a wire of an atomizer 1. A clamp  2. Wires  3. A new atomizer 4. A through sealant 5. A sleeve 6. Plugs 7. Conclusions



Appointment (to a drive)
Number of a conclusion of a socket
Colour of a wire
Atomizer And (+)
1
G the green
Atomizer And ()
2
W the white
Atomizer In (+)
3
Всиний
Atomizer In ()
4
R the red
To the electromagnetic valve of the proof-reader of idling of the conditioner (+)
5
Всиний
To the electromagnetic valve of the proof-reader of idling of the conditioner ()
6
Всиний
To the electromagnetic valve of fast idling (+)
7
B/W синебелый
To the electromagnetic valve of fast idling ()
8
B/W синебелый

13.86 Diagrams, colour marks of wires and the scheme of distributing of a socket and wires of atomizers on engines V6 (VG30i) and Z24I (since 1987) with system of preliminary injection


Appointment (to an actuation mechanism (atomizer)
+ Atomizers зеленобелый
Atomizer And to a conclusion 1
Atomizer In to a conclusion 3
Atomizers желтобелый
Atomizer And to a conclusion 2
Atomizer In to a conclusion 4
Numbering of conclusions of a socket

12. Push atomizers, having made effort by hand, turn the case and be convinced of correctness of installation of atomizers.
13. Grease a sealant of wires (photo).
14. Establish a cover of atomizers, wrap screws, having greased with fixing structure and tighten in a cross order.
15. Grease a case lining with silicone structure (the air filter establish only after схватывания silicone hermetic).
16. Establish the case заслонки upside-down.
17. Be convinced of absence of a leak, check up quality of a mix in car-care centre (to be convinced of absence подсоса air through the top sealant of an atomizer).

13.11 Installation of atomizers


13.8в the Arrangement of atomizers and valves on barks пусе заслонки 1,10. An atomizer And 2. The case заслонки 3. A thermoelement 4. To a forward part of the engine 5. The valve of the proof-reader of idling of the conditioner 6. The valve of the raised turns of idling 7,9 Atomizer In 8.


Systems of direct injection
18. Execute декомпрессию, disconnect батарек; weights also merge a liquid.
19. Disconnect wires from свеч, uncover ра пределителя and take wires aside.

13.13 Greasing of a through sealant of wires silicone structure 1. Push


13.20 Soaking up collector on engines VS


13.25 Details of fastening of an atomizer 1. Rings 2. Isolating plugs


20. Designate and disconnect all sockets of conducting, cables and hoses in a forward part of a soaking up collector (photo).
21. On engines V6 turn away bolts and remove soaking up collector.
22. Disconnect from the distributor with atomizers fuel tubes.
23. Disconnect sockets of atomizers (photo).
24. Remove the distributor with atomizers.
25. Turn away bolts and get atomizers (photo).
26. Before installation moisten new rings with gasoline and establish new atomizers, having pressed them into the distributor.
27. Establish the distributor in gathering with atomizers, turn and tighten bolts.
28. Attach to atomizers sockets.
29. Clear and establish a collector, having replaced a lining.
30. Wrap bolts of fastening of a collector to a soaking up branch pipe. Tighten with the set moment.
31. Attach a tube рециркуляции, hoses, wires and cables, without breaking their former installation. Attach collars of wires.
32. Establish a pressure regulator. Other operations are carried out upside-down.

13.23 Sockets of atomizers on engine V6


14.2 Details for adjustment of the raised turns of idling on the case заслонки 1. A thermoelement 2. The case of a heater 3. The lever throttle заслонки 4. Adjusting bиht S2 5. The adjusting screw throttle заслонки 6. Draught of a cam 7. The platen of an axis 8.



«The previous page
7.12. The case throttle заслонки (for systems with preliminary injection ТВI of systems) removal and installation
The following page»
7.14. System of injection of fuel – adjustments System of preliminary injection (TBI)