Nissan Terrano 2 with 1985 on 1999
1. The maintenance instruction and to maintenance service
2. Car maintenance service
3. Четырехцилиндровыв engines
4. Engines VS
4.1. The general data
4.2. Kinds of the repair work which is carried out without dismantle of the engine from the car
4.3. An order of installation of the piston of 1st cylinder in ВМТ a compression step.
4.4. Covers of heads of cylinders – removed and installation
4.5. The platen with коромыслами - removal and installation
4.6. Hydropushers - removal and installation
4.7. A soaking up collector - removal and installation
4.8. A final collector - removal and installation
4.9. A pulley - успокоитель - removal and
4.10. A gear belt - removal and installation
4.11. A forward epiploon коленвала - replacement
4.12. A cam-shaft epiploon - replacement
4.13. Heads of cylinders - removal and installation
4.14. A cam-shaft - removal and installation
4.15. Details клапанного the mechanism - check
4.16. The oil pallet - removal and installation
4.17. The oil pump - removal, check and installation
4.18. A back epiploon - replacement
4.19. A flywheel (a leading disk of the hydrotransformer) -
4.20. Engine support - replacement
5. All engines
6. Systems of cooling, heating, ventilation and air-conditioning
7. Fuel and exhaust systems
8. System of an electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. A mechanical transmission
11. Automatic transmissions
12. Coupling карданный a shaft and the back bridge
13. A running gear of cars with the wheel formula 4x4
14. Brake system
15. Suspension brackets and a steering
16. A body and furnish elements
17. Electric equipment system
 







4-6-gidrotolkateli-snyatie-i-ustanovka.html

4.6. Hydropushers - removal and installation

1. Uncover heads of cylinders.
2. Fix hydropushers rubber rings from drops - out (photo).
3. Remove the case with hydropushers (photo).
4. Get pushers and store in an order of their installation.
5. Check up a pusher course, having pressed on it (photo). If the course exceeds 1 mm in a hydropusher air has got.
6. If the course exceeds norm establish all details removed timing and start the engine.
7. Finish turns to 1000 rpm, through 10 mines stop the engine.
8. Remove the case with pushers and again check up a course. If at a pusher still there is air pushers replace.
9. Check up a condition of pushers (see more low).
10. Installation is carried out upside-down.

6.5 For check of a course of a hydropusher press on it in a direction specified by an arrow
1. A hydropusher



«The previous page
4.5. The platen with коромыслами - removal and installation
The following page»
4.7. A soaking up collector - removal and installation