Nissan Terrano 2 with 1985 on 1999
1. The maintenance instruction and to maintenance service
2. Car maintenance service
3. Четырехцилиндровыв engines
4. Engines VS
4.1. The general data
4.2. Kinds of the repair work which is carried out without dismantle of the engine from the car
4.3. An order of installation of the piston of 1st cylinder in ВМТ a compression step.
4.4. Covers of heads of cylinders – removed and installation
4.5. The platen with коромыслами - removal and installation
4.6. Hydropushers - removal and installation
4.7. A soaking up collector - removal and installation
4.8. A final collector - removal and installation
4.9. A pulley - успокоитель - removal and
4.10. A gear belt - removal and installation
4.11. A forward epiploon коленвала - replacement
4.12. A cam-shaft epiploon - replacement
4.13. Heads of cylinders - removal and installation
4.14. A cam-shaft - removal and installation
4.15. Details клапанного the mechanism - check
4.16. The oil pallet - removal and installation
4.17. The oil pump - removal, check and installation
4.18. A back epiploon - replacement
4.19. A flywheel (a leading disk of the hydrotransformer) -
4.20. Engine support - replacement
5. All engines
6. Systems of cooling, heating, ventilation and air-conditioning
7. Fuel and exhaust systems
8. System of an electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. A mechanical transmission
11. Automatic transmissions
12. Coupling карданный a shaft and the back bridge
13. A running gear of cars with the wheel formula 4x4
14. Brake system
15. Suspension brackets and a steering
16. A body and furnish elements
17. Electric equipment system
 







4-19-makhovik-vedushhijj-disk-gidrotransformatora.html

4.19. A flywheel (a leading disk of the hydrotransformer) -

1. Remove transmission (Gl. 7).
2. On cars from a manual transmission remove the coupling mechanism (Gl. 8).
3. Put labels of orientation of a flywheel on коленвале (photo).
4. Turn away bolts of fastening of a flywheel (a leading disk of the hydrotransformer) to коленвалу (photo).

19.3 Designation of an initial installation site of a flywheel (it is necessary not to break balancing


5. Remove a flywheel (a leading disk of the hydrotransformer)
6. Check up a condition of a frictional surface of a flywheel. Polish minor defects. Check up a deviation from a plane in calibre and щупами.
7. Combine the labels put at dismantling and establish a flywheel.

19.4 Bolts of a flywheel


8. The further operations are carried out upside-down.

«The previous page
4.18. A back epiploon - replacement
The following page»
4.20. Engine support - replacement