Nissan Terrano 2 with 1985 on 1999
1. The maintenance instruction and to maintenance service
2. Car maintenance service
3. Четырехцилиндровыв engines
3.1. The general data
3.2. Kinds of the repair work which is carried out without dismantle of the engine from the car
3.3. An order of installation of the piston of 1st cylinder in ВМТ a compression step.
3.4. A cover of a head of cylinders - removal and installation
3.5. The platen with коромыслами - removal and installation
3.6. The platen with коромыслами - dismantling and assemblage
3.7. A cam-shaft - removal and installation
3.8. A cam-shaft, support and коромысла - check
3.9. Springs of valves and маслосъемные caps - replacement
3.10. A soaking up collector - removal and installation
3.11. A final collector - removal and installation
3.12. A head of cylinders - removal
3.13. A head of cylinders - installation
3.14. The oil pump - removal and installation
3.15. The oil pump - check
3.16. A pulley коленвала - removal and installation
3.17. A forward epiploon коленвала - replacement
3.18. A forward cover - removal and installation
3.19. A chain and asterisks - removal and installation
3.20. The oil pallet - removal and installation
3.21. A flywheel (a leading disk of the hydrotransformer) - removal and installation
3.22. A back epiploon - replacement
3.23. Engine support - replacement
4. Engines VS
5. All engines
6. Systems of cooling, heating, ventilation and air-conditioning
7. Fuel and exhaust systems
8. System of an electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. A mechanical transmission
11. Automatic transmissions
12. Coupling карданный a shaft and the back bridge
13. A running gear of cars with the wheel formula 4x4
14. Brake system
15. Suspension brackets and a steering
16. A body and furnish elements
17. Electric equipment system
 







3-13-golovka-cilindrov-ustanovka.html

3.13. A head of cylinders - installation

1. Before installation carefully clear demountable surfaces of a head and the block of cylinders. Соскребите a deposit and the rests of a material of a lining, wash out solvent.
2. Check up presence on demountable planes of a head and the block of cylinders задиров, having chopped off, hollows and other damages.  Insignificant   damages   can be eliminated надфилем, in the presence of serious damages the head or the block are subject to repolishing.
3. Accurately banish carvings of bolts and in apertures under bolts.
4. Put a new lining on the block of cylinders, focusing on pins. Cautiously put a head on the block of cylinders, without breaking lining position.
5. Wrap by hand bolts of a head of cylinders on former places.
6. Tighten bolts with the set moment in the specified sequence (photo), doing 1/4 turns at one time. The inhaling order is specified in Specifications.
7. Establish a cam-shaft asterisk.
8. Other operations on assemblage are carried out upside-down.
9. After the termination of works fill system of cooling with a liquid, start the engine, check up leak presence. Check up idling turns, if necessary adjust.

13.6 Sequence of an inhaling of bolts of a head of cylinders (К24)


10. Adjust valves, having established backlashes for the heated-up engine.

«The previous page
3.12. A head of cylinders - removal
The following page»
3.14. The oil pump - removal and installation