Nissan Terrano 2 with 1985 on 1999
1. The maintenance instruction and to maintenance service
2. Car maintenance service
3. Четырехцилиндровыв engines
4. Engines VS
5. All engines
6. Systems of cooling, heating, ventilation and air-conditioning
7. Fuel and exhaust systems
8. System of an electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. A mechanical transmission
11. Automatic transmissions
11.1. Specifications
11.2. The general data
11.3. Draught of management of transmission - adjustment
11.4. The blocking switch - check and adjustment
11.5. Kick-down - the switch - adjustment
11.6. A rod of a vacuum diaphragm - adjustment
11.7. A back epiploon - replacement
11.8. Automatic transmission - removal and installation
12. Coupling карданный a shaft and the back bridge
13. A running gear of cars with the wheel formula 4x4
14. Brake system
15. Suspension brackets and a steering
16. A body and furnish elements
17. Electric equipment system
 







11-8-avtomaticheskaya-transmissiya-snyatie-i-ustanovka.html

11.8. Automatic transmission - removal and installation

Attention!
The car should be lifted on sufficient height to get transmission.

All works on transmission repair are carried out in car-care centre.
1. Consider in car-care centre codes the malfunctions brought in memory of the processor block, and establish a transmission cause of defect.
2. For removal of transmission without engine dismantle execute following operations.
3. Disconnect the battery from weight.
4. Merge трансмиссионную a liquid.
5. Lift the car and establish on supports.

7.17 Otvorachivanie of bolts of the hydrotransformer


7.25 Sample on the hydrotransformer which should be combined with a ledge on the pump


6. Remove карданный a shaft (Gl. 8) also muffle an aperture in transmission.
7. Remove a forward exhaust pipe.
8. Disconnect a socket from the blocking switch.
9. Disconnect a socket from the coil the electric drive; kick-down - a mode.
10. Disconnect a vacuum hose from a diaphragm (is directly in front of the electric drive coil).
11. Disconnect draught from the selector.
12. On a shaft картера transmissions disconnect a speedometer cable.
13. Disconnect a refuelling branch pipe and muffle an aperture in transmission.
14. On a shaft картера transmissions disconnect cooler hoses.
15. Establish under the pallet of the engine a support and prop up through брусок.
16. Uncover and designate a relative positioning of a leading disk and the hydrotransformer.
17. Slowly turning коленвал, turn on by turns 4 bolts of fastening of the hydrotransformer.
18. Remove a starter.
19. Drive under transmission the cart with a support and prop up картер.
20. Turn away bolts of fastening of an arm of a support to transmission.
21. Remove an arm from a body.
22. Turn away bolts of fastening of transmission to the engine.
23. Lower both supports so that transmission could be separated and removed in a direction to a back part of the car. To remove transmission it is recommended together.
Hand over transmission in repair or replace.

7.24 Check of palpation of a leading disk. If palpation does not correspond to norm a disk replace


7.27 Check of the adjusting size And the hydrotransformer


24. Check up palpation of a leading disk (photo).
25. Installation is carried out upside-down. Combine sample on the hydrotransformer with a ledge on the pump трансмиссионной liquids (photo).
26. Combine labels on a leading disk and the hydrotransformer, put at dismantling.
27. After hydrotransformer installation check up the size And (photo) to be convinced of correct installation of the hydrotransformer.
28. Tighten all bolts with the set moment.
29. Turn a leading disk and be convinced of smoothness of rotation of details of transmission.
30. Fill in a liquid.
31. Check up work of all switches and draught of management of transmission. If necessary adjust.

«The previous page
11.7. A back epiploon - replacement
The following page»