Nissan Terrano 2 with 1985 on 1999
1. The maintenance instruction and to maintenance service
2. Car maintenance service
3. Четырехцилиндровыв engines
4. Engines VS
5. All engines
6. Systems of cooling, heating, ventilation and air-conditioning
7. Fuel and exhaust systems
8. System of an electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. A mechanical transmission
10.1. Specifications
10.2. The general data
10.3. Epiploons replacement
10.4. A manual transmission removal and installation
10.5. 5ступенчатые a check point of types FS5W71B/C dismantling
10.6. 4-step check points of types F4W71B and With - dismantling
11. Automatic transmissions
12. Coupling карданный a shaft and the back bridge
13. A running gear of cars with the wheel formula 4x4
14. Brake system
15. Suspension brackets and a steering
16. A body and furnish elements
17. Electric equipment system
 







10-6-4-stupenchatye-kpp-tipov-f4w71b-i-s-razborka.html

10.6. 4-step check points of types F4W71B and With - dismantling

1. The order of dismantling and assemblage of 4-step check points almost same, as for 5-step also differs performance of following operations.
2. Instead of operations on dismantling in items 17-34 (section 4 see) execute the following.
1). Check up a condition of gear wheels and check point shaft, presence on them of cracks and other damages
2). Check up a face backlash of gear wheels and compare to the standard.
3). If damages are observed and люфт exceeds norm completely disassemble a check point and replace the worn out details
4). Press a stripper the forward bearing of an intermediate shaft.
5). Get a lock ring.
. Cautiously get intermediate and primary shaft.
7). Remove from a primary shaft a lock ring and a persistent washer.
8). Remove the synchronizer of 3rd both 4th transfers and a gear wheel of 3rd transfer.
9). Release a nut of a secondary shaft.
10). Remove a lock ring and a backing gear wheel.
11). Cautiously beat out from transitive section secondary and intermediate shaft.
3. Instead of operations on assemblage in items. 78-91 (section 4 see) execute the following.
1). From the back party of a secondary shaft establish a backing gear wheel, a washer and tighten by hand a nut.
2). Dress on an intermediate shaft a leading gear wheel of a backing and pick up a back lock ring on a thickness to reduce to a minimum axial люфт.
3). On the intermediate platen establish an intermediate gear wheel of a backing
4). Tighten a nut of a secondary shaft with the set moment.
5). Раскерните a nut wreath so that the wreath has come into sample of a secondary shaft.
6). Again check up a face backlash of gear wheels.

«The previous page
10.5. 5ступенчатые a check point of types FS5W71B/C dismantling
The following page»
11. Automatic transmissions